Jes and crew from Edgewater Marine sinking 35 ft pilings to replace the broken and fractured pilings from the barge "HBM 3022" and tug "Evelyn Doris" collision. New 12500 lbs lift will be installed and Elektra remounted.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.